Proactive Power and Automation’s team completed EPCM services for the installation of a power generation package at Steel Reef’s Steelman Gas Plant, located near the hamlet of Steelman, Saskatchewan. The project removed the dependency of the facility on SaskPower, making it a power island.
Project Scope
- Design, procurement and installation of one (1) 6.6 MW 4160 V Taurus 70 Natural Gas Turbine Generator
- Installation of a 600 kW Black Start Gas-engine Generator
- Provisions for the installation of turbine exhaust Waste Heat Recovery Unit (WHRU)
- Installation of capacitor assist motor starters for 2000 HP compressor motors
- Fuel gas conditioning, and piping design
- Integrated with plant control system, including plant DCS, unit control systems and ESD system
- Civil works, design and construction of the turbine generator foundation
- Piping, structural steel, piling, foundations, and earthworks
- On site commissioning and startup